{"id":88975,"date":"2021-02-15T07:30:06","date_gmt":"2021-02-15T07:30:06","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=88975"},"modified":"2021-06-18T08:54:35","modified_gmt":"2021-06-18T07:54:35","slug":"allplan-bridge","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/","title":{"rendered":"Allplan Bridge used in Lower Saxony BIM pilot project"},"content":{"rendered":"<h2>In the middle of the project, the engineers from <a href=\"https:\/\/www.tp-ing.de\/\" target=\"_blank\" rel=\"noopener noreferrer\">Thormahlen + Peuckert<\/a> successfully adopted the <a href=\"https:\/\/www.allplan.com\/uk_en\/\" target=\"_blank\" rel=\"noopener noreferrer\">Allplan<\/a> Bridge solution for modelling a challenging bridge design in Lower Saxony<\/h2>\n<p>One of the most important foundations for success in general but also one of the core principles of pilot projects is learning. It\u2019s about finding out what works and what doesn\u2019t.<\/p>\n<p>As part of the German government\u2019s efforts to promote digital design and construction, a large number of infrastructure projects are currently being carried out where the foundations for BIM are being developed. In the BIM pilot project, A1 Motorway: Bridge Replacement Over the River Hase and the Stichkanal, in Lower Saxony, near Osnabr\u00fcck, northern Germany, the dedicated <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/innovative-bim-for-bridges\/75658\/\" target=\"_blank\" rel=\"noopener noreferrer\">bridge modelling solution<\/a>, Allplan Bridge, was selected in the middle of the project \u2013 a learning curve which paid off.<\/p>\n<h3>Replacement for a seven-span bridge from 1969<\/h3>\n<p>Due to the high volume of traffic, the A1 motorway between the Ahlhorner Heide interchange and the Lotte\/Osnabr\u00fcck interchange has been widened from four to six lanes over the past several years. This expansion required six construction phases and includes a seven-span bridge built in 1969 between the Osnabr\u00fcck Nord and Osnabr\u00fcck Hafen junctions. The 261.5m long structure crosses the Osnabr\u00fcck branch canal (including the service road and embankment section), the Hase watercourse, as well as unpaved areas in the floodplain and a service road with an adjacent ditch.<\/p>\n<p>Structural analysis showed that the bridge does not have sufficient load-bearing capacity in the longitudinal and transverse directions. According to the experts, the target load level could only be achieved with a new replacement structure.<\/p>\n<h3>Preferred option: Canal and foreshore bridge<\/h3>\n<p>The client, the Lower Saxony State Authority for Road Construction &amp; Traffic, commissioned Thorm\u00e4hlen + Peuckert with an optioneering investigation in the course of the preliminary design, as well as with the modelling of the preferred option for the construction of the new replacement bridge.<\/p>\n<p>The engineers designed a total of nine options, with the structure separated into a canal bridge and a foreshore bridge in each one. Preference was given to an option consisting of a tied arch bridge with a span of 68m over the canal crossing and a subsequent foreshore bridge as a two-span plate girder with two integral support axes and variable headroom. The individual spans of the foreshore bridge vary between widths of 25.8m and 56m.<\/p>\n<figure id=\"attachment_88980\" aria-describedby=\"caption-attachment-88980\" style=\"width: 696px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-88980 size-large\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200-1024x207.jpg\" alt=\"allplan bridge, BIM pilot project\" width=\"696\" height=\"141\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200-1024x207.jpg 1024w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200-300x61.jpg 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200-768x155.jpg 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200-696x140.jpg 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200-1068x215.jpg 1068w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200-610x123.jpg 610w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200.jpg 1200w\" sizes=\"auto, (max-width: 696px) 100vw, 696px\" \/><figcaption id=\"caption-attachment-88980\" class=\"wp-caption-text\">\u00a9 THORM\u00c4HLEN + PEUCKERT<\/figcaption><\/figure>\n<h3>Change to Allplan Bridge<\/h3>\n<p>Once the preferred option had been decided upon, it still had to be modelled. The alignment axes, in particular, posed an enormous challenge, as they differed in the two-directional lanes and required, among other things, a complicated cross-sectional widening of the carriageway leading to Dortmund.<\/p>\n<p>The engineers soon realised that such was the complexity of the task and the time constraints involved that a new approach would be needed. Thus, they decided, during the ongoing project, to implement <a href=\"https:\/\/www.allplan.com\/uk_en\/products\/bridge\/\" target=\"_blank\" rel=\"noopener noreferrer\">Allplan Bridge<\/a>, the dedicated bridge solution that supports the entire design process.<\/p>\n<h3>Parametric bridge model with Allplan Bridge<\/h3>\n<p>In Allplan Bridge, they were able to create a <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/allplan-bridge-software-bim\/57500\/\" target=\"_blank\" rel=\"noopener noreferrer\">parametric bridge model<\/a> that automatically generated correct geometry based on the values entered. For example, for the Dortmund carriageway, variable slab widths for the channel bridge could be easily modelled for arch compensation or cross girder heights for slope compensation could be adjusted using Boolean operators for constant carriageway slab thickness.<\/p>\n<h3>Error-free modelling thanks to Allplan Bridge<\/h3>\n<p>Hendrik Martin, project manager for structural engineering\/bridge construction at Thorm\u00e4hlen\u00a0+\u00a0Peuckert, is enthusiastic about the benefits the switch provided.<\/p>\n<p>\u201cBy switching to Allplan Bridge during the ongoing project development, we succeeded in achieving error-free modeling of the new replacement canal and foreshore bridge on the A1 motorway near Osnabr\u00fcck,\u201d he said.<\/p>\n<p>\u201cAllplan Bridge makes it possible to implement complex <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/allplans-structural-engineering\/84085\/\" target=\"_blank\" rel=\"noopener noreferrer\">structural designs<\/a> and to adapt them to demanding route layouts. Arched structures in composite construction with subsequent semi-integral and haunched prestressed concrete structures could thus be harmonised despite differently positioned gradient girder axes.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong>ALLPLAN GmbH<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-88981 alignright\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Hendrik_Martin_RGB_1200-300x158.jpg\" alt=\"Hendrik Martin\" width=\"300\" height=\"158\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Hendrik_Martin_RGB_1200-300x158.jpg 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Hendrik_Martin_RGB_1200-768x403.jpg 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Hendrik_Martin_RGB_1200-1024x538.jpg 1024w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Hendrik_Martin_RGB_1200-696x365.jpg 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Hendrik_Martin_RGB_1200-1068x561.jpg 1068w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Hendrik_Martin_RGB_1200-800x420.jpg 800w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Hendrik_Martin_RGB_1200-610x320.jpg 610w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Hendrik_Martin_RGB_1200.jpg 1200w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p><a href=\"http:\/\/allplan.com\" target=\"_blank\" rel=\"noopener noreferrer\">allplan.com<\/a><\/p>\n<p><a href=\"http:\/\/allplan.com\/bridge\" target=\"_blank\" rel=\"noopener noreferrer\">allplan.com\/bridge<\/a><\/p>\n<p>Twitter: <a href=\"https:\/\/twitter.com\/allplan\" target=\"_blank\" rel=\"noopener noreferrer\">@allplan<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Engineers from Thormahlen + Peuckert successfully adopted the Allplan Bridge solution for modelling a challenging bridge design in Lower Saxony.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[428,576,80513,91241,464,636,790],"stakeholder_rel_tag":[172370],"contributor_rel_tag":[],"class_list":{"0":"post-88975","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"tag-bim","8":"tag-bim-software","9":"tag-bim-today-march-2021","10":"tag-bridge-construction","11":"tag-contributor-profile","12":"tag-engineering","13":"tag-sh-allplan","14":"stakeholder_rel_tag-allplan"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Allplan Bridge used in Lower Saxony BIM pilot project<\/title>\n<meta name=\"description\" content=\"Engineers from Thormahlen + Peuckert successfully adopted the Allplan Bridge solution for modelling a challenging bridge design in Lower Saxony\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Allplan Bridge used in Lower Saxony BIM pilot project\" \/>\n<meta property=\"og:description\" content=\"Engineers from Thormahlen + Peuckert successfully adopted the Allplan Bridge solution for modelling a challenging bridge design in Lower Saxony\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-02-15T07:30:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-06-18T07:54:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Bridge-in-Lower-Saxony_1200.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"Allplan Bridge used in Lower Saxony BIM pilot project\",\"datePublished\":\"2021-02-15T07:30:06+00:00\",\"dateModified\":\"2021-06-18T07:54:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/\"},\"wordCount\":689,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200-1024x207.jpg\",\"keywords\":[\"BIM\",\"BIM Software\",\"BIM Today March 2021\",\"Bridge construction\",\"Contributor Profile\",\"Engineering\",\"SH ALLPLAN\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#respond\"]}],\"copyrightYear\":\"2021\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/\",\"name\":\"Allplan Bridge used in Lower Saxony BIM pilot project\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200-1024x207.jpg\",\"datePublished\":\"2021-02-15T07:30:06+00:00\",\"dateModified\":\"2021-06-18T07:54:35+00:00\",\"description\":\"Engineers from Thormahlen + Peuckert successfully adopted the Allplan Bridge solution for modelling a challenging bridge design in Lower Saxony\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200.jpg\",\"width\":1200,\"height\":242,\"caption\":\"allplan bridge, BIM pilot project\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Allplan Bridge used in Lower Saxony BIM pilot project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Allplan Bridge used in Lower Saxony BIM pilot project","description":"Engineers from Thormahlen + Peuckert successfully adopted the Allplan Bridge solution for modelling a challenging bridge design in Lower Saxony","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/","og_locale":"en_US","og_type":"article","og_title":"Allplan Bridge used in Lower Saxony BIM pilot project","og_description":"Engineers from Thormahlen + Peuckert successfully adopted the Allplan Bridge solution for modelling a challenging bridge design in Lower Saxony","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2021-02-15T07:30:06+00:00","article_modified_time":"2021-06-18T07:54:35+00:00","og_image":[{"width":1200,"height":900,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Bridge-in-Lower-Saxony_1200.jpg","type":"image\/jpeg"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"Allplan Bridge used in Lower Saxony BIM pilot project","datePublished":"2021-02-15T07:30:06+00:00","dateModified":"2021-06-18T07:54:35+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/"},"wordCount":689,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200-1024x207.jpg","keywords":["BIM","BIM Software","BIM Today March 2021","Bridge construction","Contributor Profile","Engineering","SH ALLPLAN"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#respond"]}],"copyrightYear":"2021","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/","name":"Allplan Bridge used in Lower Saxony BIM pilot project","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200-1024x207.jpg","datePublished":"2021-02-15T07:30:06+00:00","dateModified":"2021-06-18T07:54:35+00:00","description":"Engineers from Thormahlen + Peuckert successfully adopted the Allplan Bridge solution for modelling a challenging bridge design in Lower Saxony","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/Model-of-the-Bridge-in-Lower-Saxony_1200.jpg","width":1200,"height":242,"caption":"allplan bridge, BIM pilot project"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/allplan-bridge\/88975\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Allplan Bridge used in Lower Saxony BIM pilot project"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-07 18:04:32","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/88975","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=88975"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/88975\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=88975"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=88975"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=88975"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=88975"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=88975"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}