{"id":89203,"date":"2021-02-18T10:01:40","date_gmt":"2021-02-18T10:01:40","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=89203"},"modified":"2021-02-18T10:01:40","modified_gmt":"2021-02-18T10:01:40","slug":"george-eliot-hospital","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/","title":{"rendered":"George Eliot hospital delivered on budget and ahead of schedule"},"content":{"rendered":"<h2>George Eliot hospital was delivered ahead of schedule and on budget thanks to <a href=\"https:\/\/www.wernick.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Wernick\u2019s<\/a> modular construction techniques. Discover more here<\/h2>\n<p>George Eliot hospital required a new 30-bed ward for orthopaedic elective &amp; general elective patients as part of the trust\u2019s five-year estate strategy. A high-quality, HTM and DDA compliant building was required urgently.<\/p>\n<p><a href=\"https:\/\/www.wernick.co.uk\/buildings\/about\/\" target=\"_blank\" rel=\"noopener noreferrer\">Wernick Buildings<\/a> were appointed under a pre-contract services agreement to design the building through to RIBA Stage 3. After demonstrating they could provide an economically viable, single storey solution, <a href=\"https:\/\/www.pbctoday.co.uk\/news\/tag\/sh-wernick-group\/\" target=\"_blank\" rel=\"noopener noreferrer\">Wernick<\/a> was formally appointed as principal contractor.<\/p>\n<h3>Taking advantage of modular benefits<\/h3>\n<p>By engaging with a modular provider before producing a design, the hospital was able to work with Wernick to take full advantage of the benefits of <a href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-accommodation-delivery\/80925\/\" target=\"_blank\" rel=\"noopener noreferrer\">modular construction<\/a> which included maximising the amount of fit-out that could take place in the factory to reduce time on site.<\/p>\n<p>It also facilitated closer collaboration on the specialist requirements of the building, for example using the hospital\u2019s preferred contractors to provide medical gasses.<\/p>\n<p>Manufacturing the building in a factory environment gave the project several advantages. Firstly, the building could be constructed while the foundations were being prepared, drastically reducing programme length. Manufacture was also not affected by site conditions like the weather, making the programme even more reliable.<\/p>\n<p>The building was comprised of 33 modules, including a unit to link the new wards to an existing building on-site, which was manufactured in Wernick\u2019s dedicated factory in Port Talbot. These were transported to site by lorry, then craned into position and bolted together to form the complete building.<\/p>\n<h3>Covid-safe working<\/h3>\n<p>While the initial programme was 20 weeks, the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/covid-19-construction-news\/\" target=\"_blank\" rel=\"noopener noreferrer\">Covid-19 outbreak<\/a> made the hospital\u2019s requirement more urgent. By implementing longer hours and working weekends, Wernick was able to condense the programme to just 14 weeks.<\/p>\n<p>Determined to deliver the project on time, Wernick worked with their subcontractors and the hospital to devise working methods that would allow them to continue work on-site, including strict social distancing measures. These new working methods were communicated through daily briefings and site signage.<\/p>\n<p>The closer collaboration early in the process which had minimised the amount of work needed on site also facilitated safer working while maintaining programme. Reduced time on site also meant minimum disruption to the rest of the hospital during this crucial period.<\/p>\n<p>The completed single-story building, delivered on time and on budget, consists of 1000 sqm of gross internal floor space comprising 33 modular units. The fit-out includes bedhead trunking incorporating medical gasses, nurse call systems, access control and CCTV, fire escape ramps and nurse stations. Externally, the building is finished to match existing buildings on site.<\/p>\n<blockquote><p><span style=\"font-size: 14pt;\">\u201cExcellent product, finished ahead of time and within budget. This is particularly impressive as it coincided with the Covid-19 pandemic first wave.\u201d<\/span><\/p>\n<p><span style=\"font-size: 12pt;\">&#8211; Kirstie Webb, head of estates &amp; facilities for George Eliot NHS Trust<\/span><\/p><\/blockquote>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>George Eliot hospital was delivered ahead of schedule and on budget thanks to Wernick\u2019s modular construction techniques. Discover more here.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[942],"tags":[594,54592,997,916,627,696,79411],"stakeholder_rel_tag":[172549],"contributor_rel_tag":[],"class_list":{"0":"post-89203","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-mmc-news","7":"tag-building-design","8":"tag-coronavirus","9":"tag-development","10":"tag-modern-methods-of-construction","11":"tag-modular-construction","12":"tag-offsite-construction","13":"tag-sh-wernick-group","14":"stakeholder_rel_tag-wernick-group"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>George Eliot hospital delivered on budget and ahead of schedule<\/title>\n<meta name=\"description\" content=\"George Eliot hospital was delivered ahead of schedule and on budget thanks to Wernick\u2019s modular construction techniques. Discover more here\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"George Eliot hospital delivered on budget and ahead of schedule\" \/>\n<meta property=\"og:description\" content=\"George Eliot hospital was delivered ahead of schedule and on budget thanks to Wernick\u2019s modular construction techniques. Discover more here\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-02-18T10:01:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/George-Eliot-hospital-delivered-on-budget-and-ahead-of-schedule.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1335\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"George Eliot hospital delivered on budget and ahead of schedule\" \/>\n<meta name=\"twitter:description\" content=\"George Eliot hospital was delivered ahead of schedule and on budget thanks to Wernick\u2019s modular construction techniques. Discover more here\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"George Eliot hospital delivered on budget and ahead of schedule\",\"datePublished\":\"2021-02-18T10:01:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/\"},\"wordCount\":479,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Building Design\",\"Coronavirus\",\"Development\",\"Modern Methods of Construction\",\"Modular Construction\",\"Offsite Construction\",\"SH Wernick Group\"],\"articleSection\":[\"MMC News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/#respond\"]}],\"copyrightYear\":\"2021\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/\",\"name\":\"George Eliot hospital delivered on budget and ahead of schedule\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2021-02-18T10:01:40+00:00\",\"description\":\"George Eliot hospital was delivered ahead of schedule and on budget thanks to Wernick\u2019s modular construction techniques. Discover more here\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"George Eliot hospital delivered on budget and ahead of schedule\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"George Eliot hospital delivered on budget and ahead of schedule","description":"George Eliot hospital was delivered ahead of schedule and on budget thanks to Wernick\u2019s modular construction techniques. Discover more here","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/","og_locale":"en_US","og_type":"article","og_title":"George Eliot hospital delivered on budget and ahead of schedule","og_description":"George Eliot hospital was delivered ahead of schedule and on budget thanks to Wernick\u2019s modular construction techniques. Discover more here","og_url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2021-02-18T10:01:40+00:00","og_image":[{"width":2000,"height":1335,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/02\/George-Eliot-hospital-delivered-on-budget-and-ahead-of-schedule.jpg","type":"image\/jpeg"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_title":"George Eliot hospital delivered on budget and ahead of schedule","twitter_description":"George Eliot hospital was delivered ahead of schedule and on budget thanks to Wernick\u2019s modular construction techniques. Discover more here","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"George Eliot hospital delivered on budget and ahead of schedule","datePublished":"2021-02-18T10:01:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/"},"wordCount":479,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Building Design","Coronavirus","Development","Modern Methods of Construction","Modular Construction","Offsite Construction","SH Wernick Group"],"articleSection":["MMC News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/#respond"]}],"copyrightYear":"2021","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/","url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/","name":"George Eliot hospital delivered on budget and ahead of schedule","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2021-02-18T10:01:40+00:00","description":"George Eliot hospital was delivered ahead of schedule and on budget thanks to Wernick\u2019s modular construction techniques. Discover more here","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/george-eliot-hospital\/89203\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"George Eliot hospital delivered on budget and ahead of schedule"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-07 04:35:57","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/89203","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=89203"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/89203\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=89203"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=89203"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=89203"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=89203"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=89203"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}