{"id":92594,"date":"2021-04-27T09:57:15","date_gmt":"2021-04-27T08:57:15","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=92594"},"modified":"2021-04-27T09:57:15","modified_gmt":"2021-04-27T08:57:15","slug":"heritage-building-bim","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/","title":{"rendered":"Technology, temporary access and heritage buildings"},"content":{"rendered":"<h2>Sebastian Moa, VDC engineer at temporary access provider <a href=\"https:\/\/www.haki.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">HAKI<\/a>, discusses why BIM was used to create an intricate scaffold design for Stockholm\u2019s 14th century iconic church, Storkyrkan, and highlights the difference technology is making to the renovation of the world\u2019s oldest buildings<\/h2>\n<p>Restoring any culturally significant <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/bim-for-heritage-developing-historic-buildings\/36184\/\" target=\"_blank\" rel=\"noopener noreferrer\">heritage building<\/a> takes a great deal of care and attention. The use of 3D modelling in the form of BIM is coming into its own here, ensuring the quality and speed of restoration is undertaken as sensitively as possible.<\/p>\n<p>Modern architecture as we know it today is characterised by angularity, glass exteriors and straight lines, designs of which have undergone meticulous scrutiny to ensure they fulfil Building Regulations. Heritage buildings are in a way the antithesis of contemporary structures \u2013 many of the world\u2019s most precious edifices predate legislation and were not constructed in the same fashion as those today.<\/p>\n<p>It is why extra care and attention must be paid when age-old heritage buildings undergo renovation. These buildings tend to be highly complex, with uneven edges and unique features that may have not been documented when first constructed.<\/p>\n<p>The ambiguity and sensitivity of the preservation work, therefore, really lends to the use of BIM (Building Information Modelling). BIM has huge potential in the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/historic-sites-mapping\/78863\/\" target=\"_blank\" rel=\"noopener noreferrer\">historic built environment<\/a> sector, ensuring culturally rich structures do not fall into an inescapable state of disrepair. Not only can it assure collaboration and quality across a renovation project, BIM also reduces the cost of these programmes as delivery is increased. The latter benefit is hugely important to historic renovations that are reliant on government funding.<\/p>\n<h3>Case study: Storkyrkan, Stockholm<\/h3>\n<p>Located in Stockholm\u2019s upmarket Gamla Stan (Old Town), the Storkyrkan is the city\u2019s oldest church with a history dating back to 1306. Such is its importance to Sweden\u2019s heritage, the appearance of this 14th century church has changed as time has unfolded, with strong modification undertaken in the opulent, architecturally ambitious Baroque period.<\/p>\n<p>To restore the Storkyrkan to its original exterior, it was crucial to select quality, market-leading scaffolding and temporary access solutions that would enable restoration work to be completed as seamlessly as possible.<\/p>\n<p>For this project the church\u2019s entire fa\u00e7ade, roof, tower and spire will be renovated, as over time the Storkyrkan\u2019s emblematic copper roof has faded, with exposure to Sweden\u2019s harsh winter weather contributing to the fa\u00e7ade\u2019s spalling.<\/p>\n<p>To ensure this sensitive construction work can be completed on time and to budget without compromising safety, HAKI is collaborating with its client scaffolding specialist, <a href=\"https:\/\/www.sydstallningar.se\/\" target=\"_blank\" rel=\"noopener noreferrer\">Sydst\u00e4llningar<\/a>, to deliver high-quality temporary access solutions. As a pioneer of <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/scaffolding-technology\/80002\/\" target=\"_blank\" rel=\"noopener noreferrer\">technology in the scaffold industry<\/a>, HAKI is using its BIM tool to attain 360-degree visibility of the challenging structure. This tool enables HAKI to produce a virtual replica of the Storkyrkan\u2019s exterior so its engineers can design a true-to-life blueprint that will enable 95% accuracy on the delivered materials.<\/p>\n<p>HAKI\u2019s designers are using a point cloud system to produce raw data from a highly detailed 3D scan of the Storkyrkan. This presents a clear image of the scaffolding structure and enables HAKI\u2019s team to design-out any collisions before materials are sent to site. It ensures that the right amount of product is provided, minimising delivery times and preventing waste onsite.<\/p>\n<p>As the data is stored on the cloud it can be easily imported and uploaded into HAKI BIM, a plugin that is hosted on Autodesk Revit, giving designers a holistic and scalable image of the structure at hand.<\/p>\n<p>Speaking of the use of technology, Sebastian Moa, VDC engineer at HAKI, says: \u201cThe accuracy and level of detail the 3D BIM model offers will make the scaffold design far easier and safer to install for Sydst\u00e4llningar\u2019s team. The age and sheer size of the church, not to mention the intricate, uneven details of its exterior, means it would be highly difficult to achieve the desired outcome without technology.<\/p>\n<p>\u201cAn added challenge is the Storkyrkan\u2019s location and budgetary constraints; it is in the middle of a busy city with typically narrow, medieval streets that would make it impossible to install scaffolding traditionally and safely within the desired timeframe. The 3D model of the Storkyrkan\u2019s scaffold design, therefore, will improve the time and quality of installation and will reduce costs.\u201d<\/p>\n<p>HAKI\u2019s Universal system, a safe, fast and light solution, will be applied around the body of the church, with HAKI\u2019s weightless 750 roof system enclosing the tower.<\/p>\n<p>\u201cIt will be a small roof system,\u201d Moa says. \u201cBut due to the Storkyrkan\u2019s height, we had to use a solution that would attend to the wind loads and even snow in the coming months. Both the HAKI Universal and 750 roof systems are versatile and flexible, and easy to adapt to a structure that isn\u2019t straight. As well as reducing hammer action, the hook-on method of the Universal solution uses minimal components, enabling even the most complex structures to have a simple scaffold design.\u201d<\/p>\n<p>HAKI\u2019s 750 roof system is anticipated to be in situ for up to eight months. The company will regularly maintain and monitor the solution so it performs as intended for the duration.<\/p>\n<p>Temporary works typically have a two-year lifecycle but a system such as HAKI\u2019s 750 system has an anticipated timeline of five years, creating a safe access environment for the projects\u2019 renovation teams even at great height.<\/p>\n<p>The scaffolding element of the project is fully underway and is set to be complete at end of April 2021. This landmark project for HAKI will ensure the Storkyrkan\u2019s delicate restoration can be completely safely and efficiently, bringing a much-admired cultural emblem back to its original glory.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Sebastian Moa<\/strong><\/p>\n<p>VDC engineer<\/p>\n<p>HAKI<\/p>\n<p>+46 44 494 00<\/p>\n<p><a href=\"mailto:info@haki.se\" target=\"_blank\" rel=\"noopener noreferrer\">info@haki.se<\/a><\/p>\n<p><a href=\"http:\/\/www.haki.com\" target=\"_blank\" rel=\"noopener noreferrer\">www.haki.com<\/a><\/p>\n<p>Twitter: <a href=\"https:\/\/twitter.com\/HAKIscaffolding\" target=\"_blank\" rel=\"noopener noreferrer\">@HAKIscaffolding<\/a><\/p>\n<p>LinkedIn: <a href=\"https:\/\/www.linkedin.com\/company\/haki-scaffolding-group\/\" target=\"_blank\" rel=\"noopener noreferrer\">HAKI Scaffolding Group<\/a><\/p>\n<p>Youtube: <a href=\"https:\/\/www.youtube.com\/channel\/UCqzP4rZvCTsQrfaiUA6gFOQ\" target=\"_blank\" rel=\"noopener noreferrer\">HAKI Scaffolding<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Sebastian Moa, VDC engineer at temporary access provider HAKI, discusses why BIM was used to create an intricate scaffold design for Stockholm\u2019s 14th century iconic church, Storkyrkan.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[838,428,594,277,856,688,675,84305],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-92594","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"tag-3d-scanning","8":"tag-bim","9":"tag-building-design","10":"tag-built-environment","11":"tag-construction-technology","12":"tag-digital-construction","13":"tag-heritage","14":"tag-pbc-today-may-2021"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Technology, temporary access and heritage buildings<\/title>\n<meta name=\"description\" content=\"Sebastian Moa, VDC engineer at HAKI, discusses why BIM was used to create an intricate scaffold design for Stockholm\u2019s heritage building, Storkyrkan\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Technology, temporary access and heritage buildings\" \/>\n<meta property=\"og:description\" content=\"Sebastian Moa, VDC engineer at temporary access provider HAKI, discusses why BIM was used to create an intricate scaffold design for Stockholm\u2019s 14th century iconic church, Storkyrkan\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-04-27T08:57:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/04\/Storkyrkan-Recap-utan-tr\u00e4d-Sheet-07-Unnamed-2-Sheet-07-Unnamed1-1024x799.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"799\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Technology, temporary access and heritage buildings\" \/>\n<meta name=\"twitter:description\" content=\"Sebastian Moa, VDC engineer at temporary access provider HAKI, discusses why BIM was used to create an intricate scaffold design for Stockholm\u2019s 14th century iconic church, Storkyrkan\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"Technology, temporary access and heritage buildings\",\"datePublished\":\"2021-04-27T08:57:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/\"},\"wordCount\":977,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"3D Scanning\",\"BIM\",\"Building Design\",\"Built Environment\",\"Construction Technology\",\"Digital Construction\",\"Heritage sites\",\"PBC Today May 2021\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/#respond\"]}],\"copyrightYear\":\"2021\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/\",\"name\":\"Technology, temporary access and heritage buildings\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2021-04-27T08:57:15+00:00\",\"description\":\"Sebastian Moa, VDC engineer at HAKI, discusses why BIM was used to create an intricate scaffold design for Stockholm\u2019s heritage building, Storkyrkan\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Technology, temporary access and heritage buildings\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Technology, temporary access and heritage buildings","description":"Sebastian Moa, VDC engineer at HAKI, discusses why BIM was used to create an intricate scaffold design for Stockholm\u2019s heritage building, Storkyrkan","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/","og_locale":"en_US","og_type":"article","og_title":"Technology, temporary access and heritage buildings","og_description":"Sebastian Moa, VDC engineer at temporary access provider HAKI, discusses why BIM was used to create an intricate scaffold design for Stockholm\u2019s 14th century iconic church, Storkyrkan","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2021-04-27T08:57:15+00:00","og_image":[{"width":1024,"height":799,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/04\/Storkyrkan-Recap-utan-tr\u00e4d-Sheet-07-Unnamed-2-Sheet-07-Unnamed1-1024x799.png","type":"image\/png"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_title":"Technology, temporary access and heritage buildings","twitter_description":"Sebastian Moa, VDC engineer at temporary access provider HAKI, discusses why BIM was used to create an intricate scaffold design for Stockholm\u2019s 14th century iconic church, Storkyrkan","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"Technology, temporary access and heritage buildings","datePublished":"2021-04-27T08:57:15+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/"},"wordCount":977,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["3D Scanning","BIM","Building Design","Built Environment","Construction Technology","Digital Construction","Heritage sites","PBC Today May 2021"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/#respond"]}],"copyrightYear":"2021","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/","name":"Technology, temporary access and heritage buildings","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2021-04-27T08:57:15+00:00","description":"Sebastian Moa, VDC engineer at HAKI, discusses why BIM was used to create an intricate scaffold design for Stockholm\u2019s heritage building, Storkyrkan","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/heritage-building-bim\/92594\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Technology, temporary access and heritage buildings"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-09-23 02:45:25","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/92594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=92594"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/92594\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=92594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=92594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=92594"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=92594"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=92594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}