Why certification alone won’t solve the UK’s heat pump shortfall

21
Why certification alone won’t solve the UK’s heat pump shortfall
Image: iStock | © StockSeller_ukr

Jo Shepherd, CEO at Worcester Bosch, examines why training alone isn’t creating active heat pump installers, and how training formats and market incentives must adapt to prevent financial risk to businesses

The transition to electrified home heating is routinely framed around a single, deceptively simple question: how many installers are trained to fit heat pumps? Yet treating qualification numbers as the sole measure of progress only scratches the surface of a far more intricate challenge.

Dig a little deeper into the UK’s installer network, and it’s clear that we’re not just facing a skills shortage, but a skills utilisation gap. Government survey data of Heat Training Grant graduates highlights the scale of this disconnect. Two-thirds (67%) of recently qualified engineers had not fitted a single heat pump since completing their course. However, 64% of respondents had completed their training within the past six months. Meanwhile, the Heat Pump Association’s workforce modelling indicates an activity rate of around 61%, meaning nearly four in ten qualified engineers are not actively deploying their heat pump skills.

A certificate proves someone has passed a course, not that they have a viable route to market. If we want to accelerate heat pump deployment, we must stop pointing the finger at independent engineers for being slow to transition and instead examine the commercial environment in which they operate.

The rational economics of the sole trader

In our sector, ‘the installer’ is often used as a catch-all term, as if every engineer starts the energy transition from exactly the same place. In reality, the workforce is overwhelmingly composed of small businesses. Government figures show that 95% of plumbing, heating and air conditioning firms are micro-businesses with fewer than ten employees, while less than 1% are classed as medium or large.

Another factor to bear in mind is our mature, highly experienced workforce. 63% of engineers are aged 45 or over, and 54% have spent at least two decades in the trade, according to government data. For an experienced gas engineer with 20 to 40 years under their belt, transitioning to heat pumps is not about starting from scratch, nor are they inherently resistant to change. They are simply rational business owners weighing up commercial risk.

A national energy supplier or large heating contractor can absorb the complexities of the heat pump transition across dedicated teams – splitting lead generation, property surveying, system design, and physical installation among different specialists. A sole trader shoulders every single step alone.

For a small business, the true cost of upskilling extends far beyond the price of a training course. Taking a week off the tools means lost billable days, travel expenses and depleted income. When an engineer returns to work, they face a stark commercial reality: customer demand remains heavily weighted towards gas boilers. Research from Nesta reveals that the vast majority (87%) of heat pump engineers want to install more heat pumps, but cite blockers including an inability to find suitable extra staff and unnecessary levels of admin. Similarly, government research found that 58% of existing heat pump employers struggle with low consumer demand.

If an installer qualifies to fit heat pumps, only to spend the next six months replacing boilers because that pays the bills, those newly acquired skills gather dust and confidence fades. We risk creating a two-tier market that is straightforward for large corporations to navigate, but financially perilous for the independent tradespeople who form the backbone of our industry.

Cutting administrative friction, not engineering standards

We must also recognise that comparing a boiler swap to a heat pump installation does a disservice to both. Over decades, our industry innovated to make boiler replacements fast, safe and repeatable, moving from complex gravity-fed systems and header tanks to streamlined combi boilers and push-fit plastics.

Heat pump installations require careful whole-system design. A safe, efficient installation requires property assessments, detailed heat-loss calculations, emitter sizing, potential electrical upgrades and careful commissioning. None of these engineering steps can or should be short-cut.

However, we have wrapped that necessary engineering in a heavy blanket of non-engineering administration. From navigating Microgeneration Certification Scheme (MCS) compliance to managing government grant applications, engineers are increasingly forced to act as full-time administrators.

Good governance does not have to mean excessive red tape. Look at Germany, where the digitised KfW application model has successfully reduced administrative friction by digitising funding applications and accelerating decision-making. Wherever administration does not actively protect installation quality, government and industry must work together to simplify, digitise or absorb it so skilled engineers can spend their time engineering.

Rethinking training and market incentives

To turn qualified engineers into active heat pump installers, we must align skills policy with real-world commercial incentives.

First, training formats and funding must reflect how small businesses actually operate. Rather than rigid, one-size-fits-all classroom blocks, we need modular, flexible training routes alongside financial support that accounts for lost earnings, not just course fees. Crucially, training cannot end the day an engineer receives a certificate; we need structured post-training mentorship and technical hand-holding during an installer’s first few live jobs to bridge the confidence gap.

Second, we must give micro-businesses access to shared commercial infrastructure without forcing them to scale up into large companies. Whether through manufacturer-backed design services, merchant partnerships, or connected networks of local specialists sharing administrative and compliance resources, sole traders need accessible ways to outsource the heavy lifting of systems design and MCS paperwork.

Finally, we can’t decouple skills from consumer demand. Past stop-start grant schemes have shown how fragile a business model becomes when it relies solely on shifting subsidies. Long-term policy stability, clear public messaging and mechanisms that rebalance electricity and gas pricing are essential to drive household demand.

Independent installers have adapted to every major technological shift our industry has ever faced. If we strip away unnecessary red tape, de-risk the economics of retraining and stimulate genuine consumer demand, small businesses won’t just get qualified; they will lead the UK’s clean heat transition.

Contributors

Editor's Picks

LEAVE A REPLY

Please enter your comment!
Please enter your name here